1.Overview of TVHD-5
Basic specification:
Double Station / One head
80mm screw / 22kw motor
HDPE / LDPE /PP etc material
Automatic Trimming: Neck/Bottom/Handle/Sides
Parison controller optional
Output (Bottle per hour): 5L one head--around 220
Working condition:
Power supply: 415VAC/50Hz(depending on client's country)
Water Cooling: 20ºC(10HP Water chiller or water tower)
Air source: 0.6Mpa, 0.8m3/min (1.2 m3/min air compressor)
2.Main Configuration
Main parts brand list |
|
Serial No. |
Item |
Brand |
1 |
PLC control Program |
MITSUBISHI |
JAPAN |
2 |
HMI(Human Machine Interface) |
MITSUBISHI |
JAPAN |
3 |
Pneumatic Cylinder |
SMC |
JAPAN |
4 |
Inverter |
INVT |
TAIWAN |
5 |
Electrical Parts |
SCHNEIDER |
FRANCE |
6 |
Air / Button Switch |
SCHNEIDER |
FRANCE |
7 |
Solenoid Valve |
MINDMAN |
TAIWAN |
8 |
Hydraulic system |
YUKEN |
(JAPAN) |
Category |
Item |
Unit |
Parameter |
Basic Specification |
Raw material |
------- |
PE/PP |
Max container capacity |
L |
5 |
Number of Die Head |
set |
1 |
Weight |
T |
7.8 |
Dimension(L×W×H) |
m |
3.7*2.2*2.0 |
Extrusion Unit |
Diameter of screw |
mm |
80 |
L/D of screw |
------ |
25:1 |
Plasticizing capacity |
kg |
95 |
Extrusion Driving power |
Kw |
22 |
Extruder Heating power |
Kw |
20 |
Fan Power of screw |
Kw |
0.48 |
Die Head |
Heating zones |
piece |
2 |
Power of die heating |
kw |
5 |
Clamping Force |
Clamping range |
mm |
200-250 |
Sliding distance |
mm |
400-450 |
Clamping force |
KN |
80 |
Power |
Oil pump power |
Kw |
11 |
Total Power |
Kw |
58 |
Average consumption |
Kw |
22 |
Cooling water pressure |
Mpa |
0.3 |
Cooling water consumption |
m3/h |
1.5 |
Pressure of air source |
Mpa |
0.6 |
Air consumption |
m3/min |
0.8 |
3.Application
4.After-service
1.What is the business item for this project ?
a. Delivery Date: within 45 working days after receive the deposit and samples or drawing confirmed by buyer and TONVA.
b. Port of Loading: NINGBO, CHINA.
c. Payment: 30% TT deposit, balance before shipment or 100% irrevocable L/C at sight.
d. Container needed: One 20GP container.
2.How is TONVA after-sales service?
a. Inspection
Before delivery, TONVA takes responsibility to finish the machine in time and send the right samples to clients for approval. Clients also are welcome to TONVA factory to inspect the testing of machine, so that the provided machine could be safely and smoothly put into operation once reach the client`s factory.
b. Debugging Instruction
TONVA takes responsibility to have debugging overseas, and client abroad please sends invitation forward of time to engineer of TONVA, provides the engineer with round-trip tickets, accommodation, food, vehicle and USD80/Day/Person as salary;
Before Tonva`s engineers arrive at the buyer`s factory, the buyer must make sure that all of equipment are put in the correct position in their factory, the raw material, power and water supply must be ready in the factory.
C. User Training
TONVA takes responsibility to indoctrinate technical training in both TONVA and clients' factory to the users, so that they could understand the machine features and could operate the machine by themselves.
3.What is the warranty period?
a. TONVA machine Main parts is one year warranty with a lifelong maintenance.
b. Mould within one year or 2millions warrant