• Plastic Jar Bottle Making Extruder Blow Molding Machine
  • Plastic Jar Bottle Making Extruder Blow Molding Machine
  • Plastic Jar Bottle Making Extruder Blow Molding Machine
  • Plastic Jar Bottle Making Extruder Blow Molding Machine
  • Plastic Jar Bottle Making Extruder Blow Molding Machine

Plastic Jar Bottle Making Extruder Blow Molding Machine

Type: Extrusion Blow Molding Machine
Raw Material: PP
Making Method of Parison: Extrusion-Blow Molding
Automation: Automatic
Computerized: Computerized
Certification: CE, ISO9001:2008
Customization:
Diamond Member Since 2013

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory

Basic Info.

Model NO.
TVD-3L
Multiple Layer
1-7 Layer
Capacity
5ml-3L
Number of Die Head
1-6
Transport Package
Film
Specification
CE; SGS; ISO9001
Trademark
TONVA PLASTIC MACHINERY
Origin
Taizhou
Production Capacity
400PCS/Year

Product Description

Automatic blow moulding machine Specifications

1.20 years of experience in blow molding machine
2. Deflashing system
3. Famous brand component part
4. CE; ISO9001: 2008
5.1 YEAR warranty

Main Characteristics of 3L automatic blow moulding machine:

1. Two station, single layer, 70mm screw, 15kw motor, PE / PP etc.
2. Power supply: 380VAC, 50Hz (depending on client's county ).
3. Die Head for choosing:
One head (1.5L-3L): 3L---around 200 bottles per hour
Two head (1L-1.5L): 1.5L---around 600 bottles per hour
Three head ( 300ML to 1L): 1L---around 900 bottles per hour
Four head (up to 300ml): 300ml---around 2500 bottles per hour

4. Center Distance: Two Die head: 180mm, Three Die head: 100mm
Four Die head: 60mm

5. Deflashing system: Neck/ handle/ bottom deflashing
6. MOOG 100 Points Parison Controller (Optional)

Packaging & Delivery
Packaging Details: Film packaging or wood packaging usually.

Dimention: 3000*2000*1800MM. Net Weight: 3.4 TON.

Delivery Detail: Within 40 days after receiving the deposit

After-sale service:
1. Instruction for Installation and Debugging
Before delivery, TONVA takes responsible for debugging of machine, in order to make sure the provided machine could be safely and smoothly put into operation.
TONVA also take responsibility to have debugging overseas, and Client abroad please sends invitation forward of time to engineer of TONVA, provides the engineer with round-trip tickets, accommodation, vehicle and $60 per day salary.

2. User Training
Before delivery, TONVA will take responsibility to indoctrinate technical training to the users so that they could understand the machine features and could operate the machine by themselves.

3. Warranty Period
The warranty period for TONVA machine is one year with a life long maintenance. If the user requires special quality guarantee, other stipulated warranty period may be made after mutual agreement.

Note: Information listed above are for reference only, the production line can be designed according to customer's requirements

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now